<?xml version="1.0" encoding="utf-8" standalone="yes"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom" xmlns:content="http://purl.org/rss/1.0/modules/content/">
  <channel>
    <title>Retail · Emmanuel Tsouris</title>
    <link>https://www.emmanueltsouris.com/tags/retail/</link>
    <description>Places, culture, memory, and how ordinary things work. Why is it like that?</description>
    <language>en-us</language>
    
    <copyright>© 2026 Emmanuel Tsouris</copyright><lastBuildDate>Mon, 26 Oct 2026 08:00:00 -0700</lastBuildDate>
    <atom:link href="https://www.emmanueltsouris.com/tags/retail/index.xml" rel="self" type="application/rss+xml"/>
    <item>
      <title>Two Walls at Second and Pine</title>
      <link>https://www.emmanueltsouris.com/posts/the-doyle-building/</link>
      <pubDate>Mon, 26 Oct 2026 08:00:00 -0700</pubDate>
      <guid isPermaLink="true">https://www.emmanueltsouris.com/posts/the-doyle-building/</guid>
      <dc:creator xmlns:dc="http://purl.org/dc/elements/1.1/">Emmanuel Tsouris</dc:creator><category>Places</category><category>Then &amp; Now</category>
      <description>Seattle&#39;s Doyle Building, a 1920 department store at Second and Pine, is a landmark. A new plan keeps two of its walls and puts a 23-story tower on top.</description>
      
      <content:encoded><![CDATA[<p>On Wednesday, October 21, Seattle&rsquo;s Landmarks Preservation Board set
aside an hour for one building. The agenda called it a &ldquo;briefing on
selective demolition, redevelopment, and addition.&rdquo;</p>
<p>The building is the Doyle Building, at Second Avenue and Pine Street, a
couple of blocks up from <a href="https://www.emmanueltsouris.com/posts/pike-place-market-gum-wall/">Pike Place Market</a>.
It has four stories and a terra cotta front. It was built in 1920 for the
J.S. Graham department store. The city made it a landmark in 1988.</p>
<p>I walk by it all the time when I&rsquo;m taking a walk through downtown, and I never knew its history. I took the photo at the top on one of those walks, on my way to Pike Place Market.</p>
<p>The plan keeps two of its walls and puts a tower on top.</p>
<p>In the packet the architects gave the board, the new building is 23
stories and 270 feet tall. The one there now is 55 and a half feet. It
would hold 185 homes and 104 parking spaces, parked by machine. The walls
on Second Avenue and on Pine Street stay, along with both marquees and the
cornice. The alley wall, the roof and every floor inside come out, and a
new concrete structure goes up inside the old walls to carry the tower.</p>
<p>So this is a landmark, and most of it would go. How does that work?</p>
<h2 id="a-store-for-women-and-children">A store for women and children<a class="heading-anchor" href="#a-store-for-women-and-children" aria-label="Link to this section"><svg class="icon" viewBox="0 0 24 24" aria-hidden="true"><path d="M10 14a4.5 4.5 0 0 0 6.6.4l2.5-2.5a4.6 4.6 0 0 0-6.5-6.5l-1.4 1.4"/><path d="M14 10a4.5 4.5 0 0 0-6.6-.4L4.9 12a4.6 4.6 0 0 0 6.5 6.5l1.4-1.4"/></svg></a></h2>
<p>John S. Graham came to Seattle from Sacramento after the Great Seattle Fire
of 1889 and opened a store that sold women&rsquo;s and children&rsquo;s clothing. In
1901 he bought the lot at Second and Pine, planning to build a
house on it.</p>
<p>He built a store instead. A.E. Doyle designed it. According to the history
in the packet, an early design had plain, large rectangular windows, and it
was redone in an Italian Renaissance style to set the store apart from its
competitors.</p>
<p>The store closed in 1929. After that the building held offices, banks, a
restaurant and a bookstore.</p>
<p>In 1966 Boeing turned it into open-plan offices, with desks on every floor,
the ground floor and basement included. The inside was gutted and
repartitioned, and the second-floor atrium was filled in for more office
space. In 1973 an architecture firm cleaned the terra cotta, repaired the
marquees and fitted out the ground floor for a Seattle-First National Bank
branch and a restaurant. In 1987 the original storefronts were replaced
with aluminum ones, and part of the alley wall was cut away so the basement
could become a garage.</p>
<p>M. Coy Books took one of the ground-floor spaces in 1989. It stayed about
eighteen years and closed, according to the packet, because the rent went
up.</p>
<p>Downtown buildings from that period get reused over and over. The
<a href="https://www.emmanueltsouris.com/posts/exploring-starbucks-reserve-roastery-pike-street-capitol-hill-seattle/">Roastery on Pike Street</a>
I wrote about was a 1920s auto showroom, and it closed in 2025.</p>
<p>The packet describes the Doyle Building now. The ground floor has one
retail tenant left, in 1,500 square feet. BECU moved out in 2026 after
nineteen years. The upper floors are less than half occupied.</p>
<p>So by the time Seattle made the Doyle Building a landmark, its inside had
already been taken apart once.</p>
<h2 id="what-the-ordinance-lists">What the ordinance lists<a class="heading-anchor" href="#what-the-ordinance-lists" aria-label="Link to this section"><svg class="icon" viewBox="0 0 24 24" aria-hidden="true"><path d="M10 14a4.5 4.5 0 0 0 6.6.4l2.5-2.5a4.6 4.6 0 0 0-6.5-6.5l-1.4 1.4"/><path d="M14 10a4.5 4.5 0 0 0-6.6-.4L4.9 12a4.6 4.6 0 0 0 6.5 6.5l1.4-1.4"/></svg></a></h2>
<p>A Seattle landmark isn&rsquo;t protected all over by default.</p>
<p>When the city designates one, its staff negotiate a controls and
incentives agreement with the owner. The controls name the features to be
preserved. The incentives can include zoning variances, building code
exceptions and money. Then the City Council passes an ordinance.</p>
<p>After that, changing a controlled feature takes a Certificate of Approval
from the board. The city calls it &ldquo;a written authorization, much like a
permit.&rdquo; Features that aren&rsquo;t named don&rsquo;t need one.</p>
<p>The Doyle Building&rsquo;s ordinance, number 113987, names the exterior of the
north, east and west walls, and the roof. North is Pine Street. East is
Second Avenue. West is the alley. The south wall isn&rsquo;t on the list. Some
changes to the alley wall are exempt too: vents, ducts, fire escapes,
garage doors, and new openings in it. So is in-kind repair. The interior
isn&rsquo;t named at all. The storefronts are on the controlled walls, but the
ordinance says they&rsquo;ve been changed so often they don&rsquo;t have to be put
back the way they were.</p>
<p>So nothing in the ordinance forbids keeping two walls and taking out the
rest. It means the board has to approve it. The alley wall and the roof are
on the list, so removing them needs a Certificate of Approval like anything
else that&rsquo;s named.</p>
<p>Is there a point where too little is left? The Department of Neighborhoods
told KING 5 there&rsquo;s no set percentage of a landmark that has to remain.
Each proposal is judged on its own. The department also said it doesn&rsquo;t
keep a count of designated landmarks that have been demolished.</p>
<p>The city&rsquo;s own explanation of its preservation program says the goal &ldquo;is
to manage change, not to eliminate it.&rdquo;</p>
<h2 id="twelve-stories-then-eighteen">Twelve stories, then eighteen<a class="heading-anchor" href="#twelve-stories-then-eighteen" aria-label="Link to this section"><svg class="icon" viewBox="0 0 24 24" aria-hidden="true"><path d="M10 14a4.5 4.5 0 0 0 6.6.4l2.5-2.5a4.6 4.6 0 0 0-6.5-6.5l-1.4 1.4"/><path d="M14 10a4.5 4.5 0 0 0-6.6-.4L4.9 12a4.6 4.6 0 0 0 6.5 6.5l1.4-1.4"/></svg></a></h2>
<p>The owners have tried before.</p>
<p>In 2007 a plan added one floor of offices on the roof. It went to the
board once. The seismic upgrades that came with it, three large steel
braces running from the basement to the new top floor, made it too
expensive, and it was dropped.</p>
<p>In 2018 a plan added a penthouse and turned the offices into apartments.
That counted as a substantial alteration under the building code, which
meant a full seismic upgrade. It was dropped before it reached the board.</p>
<p>In August 2025 the architects, Clark/Barnes, brought the board a 12-story
mass timber addition: 16 stories in all, 180 feet tall. The Urbanist
reported that board members were open to the idea but worried about scale.
&ldquo;It does, as some people have noted already, does seem to overwhelm the
landmark,&rdquo; board member Matt Inpanbutr said. Scott Clark told the board
that if the addition had to be set back from the old walls, &ldquo;we can&rsquo;t do
the project.&rdquo;</p>
<p>Two laws changed after that. A state law that took effect in July 2025
bars cities from requiring setbacks on upper floors for mass timber
buildings. A Seattle ordinance that took effect in July 2026 exempts mass
timber apartment buildings from the city&rsquo;s rules on tower spacing and
setbacks.</p>
<p>City staff asked the architects why the tower had gained six floors since
2025. The answer, in their cover letter, was those laws. The zoning there
allows a residential tower of 440 feet. The building code table the packet
cites stops mass timber at 270. The new plan is 270 feet.</p>
<p>So the plan that went to the board on October 21 is a four-story concrete
structure inside the old walls, a one-story concrete &ldquo;gasket,&rdquo; and 18
stories of mass timber above that.</p>
<p>Not every account matches. Hoodline&rsquo;s report, published on October 22,
gives about 150 homes and cites filings for the 16-story,
180-foot version, alongside the 23 stories and 270 feet reported by KING 5,
and calls the difference unreconciled. The newer number is in the packet:
185.</p>
<h2 id="facadism">Facadism<a class="heading-anchor" href="#facadism" aria-label="Link to this section"><svg class="icon" viewBox="0 0 24 24" aria-hidden="true"><path d="M10 14a4.5 4.5 0 0 0 6.6.4l2.5-2.5a4.6 4.6 0 0 0-6.5-6.5l-1.4 1.4"/><path d="M14 10a4.5 4.5 0 0 0-6.6-.4L4.9 12a4.6 4.6 0 0 0 6.5 6.5l1.4-1.4"/></svg></a></h2>
<p>Historic Seattle opposes the plan. In a letter to the board, its director
of preservation services, Eugenia Woo, called it facadism, not a real
addition to a landmark or a reuse of one. The group also points out that
the landmark controls cover the alley wall and the roof. Woo had written
about the 2025 version that it &ldquo;treats the landmark building as a
four-story base for the new tower.&rdquo;</p>
<p>The architects make the opposite case. Their packet says the building&rsquo;s
future &ldquo;is at risk,&rdquo; and that on floors this small, only a tall addition
makes the project pay for itself. Their conclusion says preservation
and density &ldquo;are not mutually exclusive.&rdquo;</p>
<p>Next door to the south is 1521 Second Avenue, a 38-story condominium
tower built in 2006. In 2025 many of the objections came from people who
live there.</p>
<h2 id="what-happens-next">What happens next<a class="heading-anchor" href="#what-happens-next" aria-label="Link to this section"><svg class="icon" viewBox="0 0 24 24" aria-hidden="true"><path d="M10 14a4.5 4.5 0 0 0 6.6.4l2.5-2.5a4.6 4.6 0 0 0-6.5-6.5l-1.4 1.4"/><path d="M14 10a4.5 4.5 0 0 0-6.6-.4L4.9 12a4.6 4.6 0 0 0 6.5 6.5l1.4-1.4"/></svg></a></h2>
<p>A briefing isn&rsquo;t a vote. The board hears the plan, hears public comment
and says what it thinks. Nothing gets approved.</p>
<p>To go ahead, the owners need a Certificate of Approval. Their packet says
the plan for bracing the two walls during construction will come with that
application, and it ends by asking the board to let the project move on to
its Master Use Permit. On the city&rsquo;s timeline, once staff decide an
application is complete, the board has to take it up within 30 days and
decide within 45.</p>
<p>As of October 26, the board hasn&rsquo;t voted on anything.</p>

<section class="sources">
  <h2 id="sources">Sources and further reading</h2>
  <ul>
<li><a href="https://seattle.gov/documents/Departments/Neighborhoods/HistoricPreservation/Landmarks/2026/LPB102126AGENDA.pdf" rel="noopener">Landmarks Preservation Board agenda, October 21, 2026</a>. City of Seattle, for the briefing, its wording and its hour.</li>
<li><a href="https://seattle.gov/documents/Departments/Neighborhoods/HistoricPreservation/Landmarks/2026/LPB102126DoyleBP.pdf" rel="noopener">The Doyle Building, Landmarks Preservation Board Briefing #2</a>. Clark/Barnes, September 2, 2026, revised October 2, 2026, for the plan, the building&rsquo;s history, the landmark controls, the 2007 and 2018 attempts, the occupancy figures and the answer to staff about the added floors.</li>
<li><a href="https://www.seattle.gov/documents/Departments/Neighborhoods/HistoricPreservation/Landmarks/2025/LPB080625DoyleBuildingBP.pdf" rel="noopener">The Doyle Building, Landmarks Preservation Board Briefing</a>. Clark/Barnes, July 29, 2025, for the 12-story, 180-foot version.</li>
<li><a href="https://www.theurbanist.org/2025/08/07/downtown-mass-timber-tower-project-meets-resistance-at-seattle-landmark-board/" rel="noopener">Downtown Mass-Timber Tower Project Meets Resistance at Seattle Landmark Board</a>. Ryan Packer, The Urbanist, August 7, 2025, for the 2025 briefing and the quotes from it.</li>
<li><a href="https://hoodline.com/2026/10/pike-place-market-faces-23-story-tower-plan-that-could-gut-historic-doyle-building/" rel="noopener">Pike Place Market faces 23-story tower plan that could gut historic Doyle Building</a>. Hoodline, October 22, 2026, citing KING 5 and the Daily Journal of Commerce, for Historic Seattle&rsquo;s letter and the Department of Neighborhoods&rsquo; answers.</li>
<li><a href="https://www.seattle.gov/neighborhoods/historic-preservation/city-landmarks" rel="noopener">City Landmarks</a>. Seattle Department of Neighborhoods, for designation and controls and incentives agreements.</li>
<li><a href="https://www.seattle.gov/neighborhoods/historic-preservation/certificate-of-approval" rel="noopener">Certificate of Approval</a>. Seattle Department of Neighborhoods, for what one is and the timeline.</li>
<li><a href="https://www.seattle.gov/neighborhoods/historic-preservation/frequently-asked-questions" rel="noopener">Frequently Asked Questions</a>. Seattle Department of Neighborhoods, for &ldquo;manage change, not to eliminate it.&rdquo;</li>
</ul>

</section>

]]></content:encoded>
    </item>
  </channel>
</rss>
